People are asking ... what will the KCB City Commission do at the "Updated Design" Special Meeting?

The City Commission has called a special meeting in Marble Hall and as a Zoom webinar this Monday, March 17, beginning at 9:30 a.m. Please note the unusual day.

The agenda includes:

The agenda includes the updated conceptual city hall floorplan and the timeline to proceed to the next phase of design "schematics."

Observations of the 3-17-25 conceptual city hall floorplan

People Are Asking several questions about this concept drawing:

In architectural floor plans, an arrow on stairs or a ramp points in the direction of the uppermost step.
The optical illusion of an endless or impossible staircase is commonly known as the "Penrose stairs or Penrose steps."

    Ground Floor
  • There are no stairs or ramp to the entrance veranda. Why does the entrance veranda appear to be at ground level? It appears to have doors to a ground level lobby, Mayor Foster's 600 s.f. ground level gym, and the stairs leading to the second floor.
  • The 640 s.f. lobby on the first floor shows a ramp on the west and north sides of the elevator shaft. The arrow shows the ramp leads up to a landing with a doorway to the "main hallway" of the city hall offices. The arrow on the four stairs on the east side of the elevator shaft shows they also go up to that landing. The center of the lobby has a circular staircase leading to the second floor.
  • It appears that the central hallway, mechanical room(s), bathrooms, administrative offices, storage room, and conference room are all at the same elevated level. That level is reached by stairs or ramp going up from the lobby but there is neither stairway nor ramp back down to Marble Hall. Why does the "loop" formed by Marble Hall, the parking lot, the ramp or steps in the lobby, and the center hall appear to be a "Penrose stair," going around and around and getting nowhere?
  • It is likely that the conceptual drawing ignored architectural convention and that the lobby is elevated which means the ramp and stairs lead down to the administrative offices. If that is the case, why does the drawing ignore the need for a ramp and four or more steps from the parking lot up to the veranda?
  • This plan still makes people climb UP to the main entrance, lobby, and elevator, and then go DOWN to the dungeon to see city staff.
  • Why are the administrative offices are completely isolated from the public, reached only through a gatekeeper office with doors from the hallway and into the office area?
  • The conceptual drawing shows six offices and cubicals (sic) plus a reception desk. Are we planning to add staff?
  • If the administrative offices are at ground level, why is the only ground floor records storage room below Base Flood Elevation?
  • Why is there no locker or changing space in the non-ADA "gym" bathroom? And why not arrange the design so the gym shares bathrooms with Marble Hall and the administrative space?
  • Why does this concept show a "break room" in Marble Hall, not the kitchen?
  • Why is there a circular stairway? Circular stairs are lovely features but they take a lot of space, and are difficult to navigate with stretchers, equipment, or furniture.
  • Second Floor
  • Why does the second floor have a huge and mostly empty 640 s.f. lobby space?
  • The second floor Building Official office has space for two clerks plus a receptionist plus a drafting room and a necessary storage room. Are there plans to hire even more staff?
  • The second floor has a second reception area for the police department. Why does a city of 700 residents need two receptionists for the second floor?
  • Why are there additional mechanical and electrical rooms on the second floor?
  • Why don't the second floor bathrooms appear adequate as locker and changing space for our police officers?
  • Other Issues
  • Why don't the "design schematics" include value engineering?
  • With commercial construction costing some $500 per square foot in the Keys why are we planning to spend nearly a million dollars for lobbies and a gym?
Concept drawings are just that, ideas to be discussed between KCBers, the commissioners, and the architect. There will be many more questions as we examine the plans more closely. Click or tap here to email the commissioners and city clerk to ask these and other questions about the plans.

Read the Special City Commission Meeting Agenda Packet here.
See the conceptual city hall floorplan here.
Read the working contract here.

Join the 3/17/25 meeting from a PC, Mac, iPad, iPhone or Android device: Please click this URL to join. https://us02web.zoom.us/j/86528492272?pwd=bdHYVt7f3rzU24ppWrjhYDWnpG9Vl1.1
Passcode: 145446


The KCB City Commission held an "Updated Design" Special Meeting

The City Commission called a special meeting in Marble Hall and on Zoom on Monday, March 17 to discuss the updated conceptual city hall floorplan.

The Zoom feed was interrupted by "George Stuzen" sharing a Ku Klux Klan rally video and a pornographic video collage, all tagged as "raided by CCP Thugs." The city turned off the Zoom feed entirely during citizen comments so people on Zoom were unable to attend or participate.

Some of our descriptions were thought to disparage the design or plans.
"Dungeon" is defined as a strong, enclosed space usually in the lowest level of a castle; the keep or stronghold.
"Tower" is defined as a building or structure high in proportion to its lateral dimensions, either isolated or forming part of a building.
We'll use neutral language to describe these architectural features in the future.

The city did then have the architect's presentation via Zoom but it was not shared with KCBers so no one outside of Marble Hall could take part. The commissioners approved the updated conceptual city hall floorplan.



What did residents
have to say about this
?

 

Contents...
What People Are Asking

About Referendum Votes
and Recall Elections


About the "Taj ma-KCB"
About the Original City Hall
About the New City Hall
About the City Staff
About Egregious Code Enforcement
About the City Commission
About City Resources
About City Finances
About the Trailers
About the Loss of Community

What People Are Saying ...
Local News,
Letters to the Editor,
and Other Commentary

KCB Month-by-Month


 
  About this Site
Definitions
F.A.Q.
KCB Directory of City Officials
  [this link opens a page on the City website]
KCB News and Commentary
Letters to the Editor

  And All the Questions
  People Have Asked,
  (Solely about Key Colony Beach)
  Sorted by Category:

Table of Contents

And, finally, What IS
"Concerned in KCB"?
       
    03-05-2025